Tasks:
The preliminary concern of the design was based on it being an economical structure with prompt delivery. The structure of a metal building was erected using prefabricated material ensuring immediate delivery. Corrugated metal and aluminium sheets were used and an elegant industrial style was maintained. The corporate identity logo determined the coloring of the building.
Photos